<i id="n7z5r"><pre id="n7z5r"><mark id="n7z5r"></mark></pre></i>

            <i id="n7z5r"></i>
                <i id="n7z5r"><em id="n7z5r"><ins id="n7z5r"></ins></em></i>

                  <output id="n7z5r"><em id="n7z5r"><output id="n7z5r"></output></em></output><ruby id="n7z5r"><em id="n7z5r"><output id="n7z5r"></output></em></ruby>
                  <menuitem id="n7z5r"><em id="n7z5r"><big id="n7z5r"></big></em></menuitem>

                  <sub id="n7z5r"></sub>

                    The solver of the large column distance problem:

                    With the continuous improvement of the owner’s requirements for space utilization, to meet the production needs of various industries, the column spacing has been expanded from the previous 6~9m to the current 12m and above. For the column spacing of 12m and above, ordinary purlins can no longer meet the requirements. , The truss-type purlin can easily solve the problem and solve the problem for the owner.
                    GB51022-2015 [Technical Specification for Steel Structures for Lightweight Portal Framed Buildings] Chapter 9, Purlin and Wall Beam Design 9.1.1 clearly states that "truss-type components should be used for simply supported purlins with a span greater than 9m".


                    Customized service:

                    Truss-type purlins can be customized according to the height, span, load-bearing capacity and customer needs. RK series steel trusses have up to 96 models in the standard load table for customers to choose from, but not limited to this; truss-type purlins allow pipes , Bridge, and electrical pipes pass through the structure.



                    Advanced hanging system:

                    Due to the special structure of the Peterson truss with an advanced hanging system, the hanging problem can be easily realized without welding or drilling. And in the early stage of the design, you can reserve the position in advance, and the hanging position can be moved at will, saving the amount of renovation.


                    Save total project cost:

                    Peterson steel trusses can save the total project cost by saving steel consumption and advanced hanging system. At the same time, the company continues to study new truss connection modes, so as to reduce costs and improve product core competitiveness. The owner can choose different connection methods for use according to their needs.


                    Replacement of C/Z Purlin:


                    Comparison table of technical and economic analysis of steel truss purlins and 

                    cold-formed thin-walled Z purlins - general working conditions

                    Steel truss purlin

                    Z-shaped purlin

                    Steel truss purlin

                    Z-shaped purlin

                    Bay Spacing

                    12m

                    Spacing

                    1500mm

                    1500mm

                    1500mm

                    1500mm

                    Bay Spacing

                    PSJ-R500K01

                    XZ300*80*25*2.3/3.0

                    PSJ-R600K02

                    XZ300*85*25*2.8/3.3

                    Material

                    Q420

                    Q345B

                    Q420

                    Q345B

                    Normal load

                    Dead load:0.2KN/;Live load:0.5KN/;Wind load:0.3KN/;
                    Snow load:0.2KN/;Suspended load:0.15KN/

                    Dead load:0.2KN/;Live load:0.5KN/;Wind load:0.35KN/;
                    Snow load:0.6KN/;Photovoltaic:0.2KN/;Suspended load:0.15KN/

                    Steel consumption for linear meters

                    8.366kg/m

                    10.373kg/m

                    9.63kg/m

                    13.048kg/m

                    Steel consumption per square meter

                    5.577kg/m*m

                    6.915kg/m*m

                    6.42kg/m*m

                    8.699kg/m*m

                    Conclusion

                    For the roof system with 12m column spacing, 
                    under the same load requirements, 
                    the use of Peterson purlins can save up to 19% of the steel 
                    consumption than the cold-formed thin-walled C.Z purlins.

                    For a roof system with a column spacing of 12m,
                    under the same load requirements,
                    the use of Peterson purlins can save up to 26% of the steel
                    consumption compared to the use of cold-formed thin-walled C.Z purlins.



                    Comparison of technical and economic analysis of steel truss purlins and 

                     cold-formed thin-walled Z purlins - main line conditions

                    Steel truss purlin

                    Z-shaped purlin

                    Steel truss purlin

                    Z-shaped purlin

                    Bay Spacing

                    12m

                    Spacing

                    1500mm

                    1500mm

                    1500mm

                    1500mm

                    Bay Spacing

                    PSJ-R500K02

                    (2)XZ300*80*25*2.0/2.3

                    PSJ-R600K03

                    (2)XZ300*85*25*2.3/2.8

                    Material

                    Q420

                    Q345B

                    Q420

                    Q345B

                    Load requirements

                    Dead load:0.2KN/;Live load:0.5KN/;Wind load:0.3KN/;
                    Snow load:0.2KN/;Suspended load:0.15KN/

                    Dead load:0.2KN/;Live load:0.5KN/;Wind load:0.35KN/;
                    Snow load:0.6KN/;Photovoltaic:0.2KN/;Suspended load:0.15KN/

                    Special load

                    Main line load:180kg/m

                    Main line load:240kg/m

                    Steel consumption for linear meters

                    9.26kg/m

                    17.742kg/m

                    10.62kg/m

                    21.826kg/m

                    Steel consumption per square meter

                    6.173kg/m*m

                    11.828kg/m*m

                    7.08kg/m*m

                    14.551kg/m*m

                    Conclusion

                    For main line hanging, the special suspension system 
                    of Peterson steel truss purlin can save 48% of steel. 
                    And in the installation of mechanical and electrical 
                    equipment in the process of eliminating the traditional 
                    installation process of the necessary air welding and drilling.
                    For main line hanging, Z-purlins must be suspended by 4 purlins, 
                    and special suspension system of Peterson steel truss purlins is used. 
                    Only 2 purlins are suspended, saving 51% of steel. 
                    And in the installation of mechanical and electrical 
                    equipment in the process of eliminating the traditional 
                    installation process of the necessary air welding and drilling.



                    Replacement Of High Frequency Welding Purlin:


                    Technical and economic analysis comparison table of steel truss purlin and 
                    high frequency welded H-shaped steel purlin

                    Steel truss purlin

                    High frequency welding H-shaped rigid purlin

                    Steel truss purlin

                    High frequency welding H-shaped rigid purlin

                    Column distance

                    12m

                    15m

                    Spacing

                    1500mm

                    1500mm

                    1500mm

                    1500mm

                    Section size

                    PSJ-R500K01

                    H350*150*3.2*4.5

                    PSJ-R650K02

                    H350*150*4.5*6

                    Material

                    Q420

                    Q345

                    Q420

                    Q345

                    Load

                    Dead load: 0.2KN/; Live load: 0.5KN/; Wind load: 0.45KN/;

                    Snow load: 0.45KN/;Suspension load: 0.3KN/

                    Steel consumption for linear meters

                    8.366kg/m

                    17.91kg/m

                    9.82kg/m

                    24.3kg/m

                    Steel consumption per square meter

                    5.577kg/m*m

                    11.94kg/m*m

                    6.547kg/m*m

                    16.2kg/m*m

                    Expanded area (m*m)

                    11.3

                    15.6

                    14.6

                    19.5

                    In conclusion

                    For the roof system with 12m column spacing,

                    The use of Peterson steel truss purlins saves up to 53% 
                    of the steel consumption compared to the use of high-frequency 
                    welded H-shaped steel purlins

                    For the roof system with 15m column spacing,

                    The use of Peterson steel truss purlins saves up to 60% of the 
                    steel consumption than the use of high-frequency welded H-shaped steel purlins

                    It can be seen from the above data that under the same load, the higher the column spacing requirement, 
                    the greater the saving of steel by using Peterson steel truss.

                    At the same time, it can save more than 25% of the fireproof coating area and more 
                    than 30% of the engineering cost of the roof substructure;

                    Because the Peterson hollow steel truss purlin system has a special suspension system,

                    it saves the air welding and drilling necessary for traditional installation during the electromechanical equipment

                    installation process, thereby saving more than 30% of the labor cost of the electromechanical contractor.


                    Hotline Email
                    japanesefree高清日本 <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <文本链> <文本链> <文本链> <文本链> <文本链> <文本链>